  1. In short: construction site access control relies on three mandatory elements.

  2. First - permit-to-work before starting work (Order

  3. Ministry of Labor Order No. 883n, rev. 29/04/2025): without it, there are regulatory orders and criminal liability in the event of an incident.

  4. The second is a fenced site with a checkpoint and access tracking (SP 48.13330.2019, rev. 21.04.2025).

  5. Third - ACS, connected to 1C and ERP so every entry is automatically recorded in the timesheet.

  6. If you deploy biometrics with face recognition, since June 1, 2023 you cannot store original facial data locally: only an encrypted buffer for up to 24 hours and transfer to EBS under 572-FZ - otherwise the fine for a legal entity is 3-18 million RUB.

  7. The cost of inaction is losses of 3-7% of the project budget to theft and false reporting.

16.35 billion RUBACS market in CIS in 2024; up to 170 billion rubles by 2030 (Securika Moscow forecast)
3–7%of the project budget is lost to theft and padding without access control (2021 estimate)
>300 billion RUBlosses in CIS's construction industry in H1 2025 - an industry benchmark for the cost of inefficiency

What the law requires

  1. Before work begins at an operating facility, a permit-to-work must be issued - this is a direct requirement of occupational safety rules (Order

  2. Ministry of Labor Order No. 883n, recommended form is in the annex to the Rules).

  3. Without it, the company receives orders to correct violations, faces inspection risks, and is liable for the consequences of accidents.

  4. Without access control, money leaks straight out: theft, timesheet padding, fines, and the risk of a work stoppage.

  5. Penalties can reach 1 million rubles under Article 9.4 of the Administrative Offenses Code for repeated violations, including suspension of work for up to 90 days.

Three tasks of access control

Restrict access

Unauthorized people are kept out. The system shows who is on site right now, reducing theft and incidents.

Track working time

You can see who came on shift, when they entered, and when they left. The timesheet no longer diverges from reality.

Control assets

Entry and exit of people and vehicles are recorded, reducing losses of materials and equipment.

2026 regulatory framework: what is required and what it risks

Construction site access control is governed by several documents at once, from occupational safety to fire safety rules. Below are the current 2025 versions and penalties for violations.

DocumentWhat needs to be donePenalty
Ministry of Labor Order No. 883n (revised 29.04.2025)Complete the permit-to-work before starting, do not allow people without PPE and safety briefing, and control site entryFine for a legal entity: 50,000-80,000 RUB, up to 200,000 RUB for repeat violations; criminal liability in case of injury
SP 48.13330.2019 (rev. 2025-04-21)Fence the site, set up a checkpoint, keep access logs, and provide vehicle entry and site visibilityFine of 100,000-300,000 RUB; for endangerment, up to 600,000 RUB or work stoppage for up to 60 days
Fire Safety Rules, Government Decree No. 1479 of 16.09.2020 (revised 03.02.2025)Site layout at the entrance, fire vehicle access, and for large sites at least two entrancesFine of 300,000-400,000 RUB, up to 800,000 RUB under a special regime; criminal liability if damage is caused
Article 9.4 of the Code of Administrative Offenses of the CISComply with building codes and design documentationFine of up to 600,000 RUB; for repeat violations, up to 1 million RUB or work stoppage for up to 90 days
Article 216 of the Criminal Code of the CISFollow construction site safety rulesIf there is damage or injury - a fine, forced labor, or imprisonment for up to 7 years
572-FZ (for biometrics)Do not store original faces locally: buffer for up to 24 hours and transfer to the UBSFine for a legal entity: 3-18 million RUB; for biometric data leakage, up to 500 million RUB (Law 420-FZ)

Pass types and access levels

When access control is set up correctly, there is no confusion at the checkpoint: the system records personnel arrivals and departures and controls material movement. Let’s look at the main types of passes on a construction site.

TypeFor whomMediumTiming and speed
PermanentGeneral contractor, engineers, key specialistsCard, mobile pass, or faceIndefinite; passage 1-2 sec
TemporarySubcontractor employeesCard or QR codeFor a task (2 weeks to a month); access is closed automatically
One-timeVisitors, inspectors, suppliersSystem entry, supportHours to one day; only with an escort
MaterialImport and export of materials and equipmentPlan/actual requestFor movement; stock reconciliation without losses
TransportSpecific vehicleLicense plate recognitionFor entry; passing the checkpoint takes 5-7 sec

Technical means for access control

An access control and management system (ACS) combines employee tracking, access control, and site data. The key is not the turnstiles and cameras themselves, but how they pass events to other programs: connected to 1C and ERP ACS records working time, updates access rights, and removes manual entry.

How a pass becomes a timesheet entry

The path of one entry: from card to timesheet

Event

Presented a card or face1-2 seconds, the turnstile opened

Logging

Checkpoint controllertime and employee ID
ACSaccess and briefing check

Accounting

1C / ERPtimesheet entry automatically
Managerhow many people are on site right now
One entry, and the data flows straight into the timesheet: security does not enter anything manually, and managers see the site's actual workload.

ACS as the integration core, not a set of devices

Construction Site Access Control: ACS and Law 2026At the center is ACS, surrounded by four satellite systems: 1C and ERP for timesheets and access, video surveillance against using someone else's badge, a construction management platform with shift schedules, and the state biometric system EBS for data transfer under 572-FZ. The arrows show event exchange between ACS and each system.ACSintegration core1C / ERPVideo surveillanceConstruction platformEBS / EBS Registertimesheets, payroll, access rightsentry using someone else's passpeople on shift, schedulebiometrics under 572-FZ
Value comes not from hardware, but from connected systems: access events from ACS flow into 1C and ERP, video surveillance, the construction management platform, and the national biometrics system EBS.

Biometrics on site: where to legally store facial data

A card or QR code can be easily handed to someone else, but a face cannot: the system identifies an employee in 1-2 seconds, and with helmets and gloves it is also more convenient than a card.

But biometrics have a separate legal framework

Since June 1, 2023, commercial operators have been prohibited from storing original biometric data locally: face data may be kept in an encrypted buffer for no longer than 24 hours and transferred to

the Unified Biometric System (EBS).

A local ACS with face recognition without transmission to the UBS is already a violation.

No local storage - only buffer and UBS

Construction Site Access Control: ACS and Law 2026The camera recognizes a face at the entrance. Storing the original face locally on site has been prohibited since June 1, 2023, with fines from 3 to 18 million rubles; the legal approach is to keep the face in an encrypted buffer for no longer than 24 hours and transmit it to the Unified Biometric System.The camera recognizes a faceLocally on sitePROHIBITED since 01/06/2023fine of 3-18 million RUBBuffer <= 24 h -> EBSencrypted, then transmittedlegally under 572-FZ
The face image cannot be stored on site: the law allows only a short encrypted buffer and transfer to the EBS.

The cost of a biometrics mistake

Five steps to launch access control

  1. 01

    Site audit and flow calculation

    Mark entrances, driveways, and equipment zones, assess peak load, and set access levels. Accurate site audit determines the number of turnstiles, passage width, and server capacity.

  2. 02

    Access control regulations

    Approve local rules: which passes are issued and how they are revoked, how people and vehicles enter, and how materials are accounted for. For biometrics, obtain consent to process personal data.

  3. 03

    Choosing equipment and a contractor

    Choose outdoor-rated equipment (dust, vibration, temperature swings) and a contractor with experience integrating ACS, 1C, and construction management platforms.

  4. 04

    Installation and integration

    Install the equipment together with the fencing, connect the ACS to HR records and video surveillance, and run a 3-5 day pilot.

  5. 05

    Training and launch

    Train gatehouse operators and administrators, appoint a responsible person for oversight, and conduct regular rule audits.

Five common mistakes

Digital construction site pass: the Samolet Group experience

  1. The Samolet Group has dozens of sites and thousands of workers.

  2. Passes used to be issued manually, taking up to 15 minutes per person; when contractors changed, access was not closed on time, and payroll grew without actual workload.

  3. The developer implemented the 10D Pass module from the 10D Platform ecosystem: online requests, instant access approval, QR-code passes, and an online headcount tracker on site.

  4. Loading employee data into a single database, document verification, and automatic access deactivation after contract expiration eliminated manual routine work. In July 2025, "10D Pass" was moved to OVISION biometrics with Face ID and integrated with

  5. by the regional segment of the Unified Biometric System (RS EBS) and

  6. the AIS Digital Twin builders registry - with declared compliance with 572-FZ and the requirements

  7. The system recognizes a face and blocks entry with someone else's badge.

15 -> 5 minprocessing: previously one person at a time, now one request for up to 50 at once
−90%office workload
3 days -> 4 htime to close access tasks

Sources

Verified on 08.07.2026.

TopicSource
ACS market and forecastru-bezh.ru/infografika/skud-dokazyvaet-svoyu-sostoyatelnost
Forecast up to 170 billion RUB (Securika Moscow 2025)ru-bezh.ru/meropriyatiya/news/25/04/25/rost-do-170-mlrd-rubley-na-securika-moscow-sdelali-prognoz-razvi
ACS trends, biometrics, cloudsecurtec.ru/company/news/2025/budushchee-skud-tsifrovizatsiya-biometriya-i-oblachnye-tekhnologii/
Fire Safety Rules, Government Decree No. 1479consultant.ru/document/cons_doc_LAW_363263/
Repeal of Government Decree No. 390 since 01.01.2021kritery.ru/news/39
Ministry of Labor Order No. 883n (revised 29.04.2025)consultant.ru/document/cons_doc_LAW_372506/
SP 48.13330.2019 (rev. 2025-04-21)base.garant.ru/73866924/
SP 48.13330.2019, 2025 updatemeganorm.ru/mega_doc/norm_update_05072025/akt_forma/0/sp_48_13330_2019_svod_pravil_organizatsiya_stroitelstva_snip.html
GOST 21.205 - symbols, not a permit-to-work actdocs.cntd.ru/document/gost-21-205-93-spds
572-FZ: Working with biometrics without finesitgsecurity.ru/blog/how-to-avoid-fines-under-federal-law-no-572-when-working-with-biometrics
Personal data processing in the UBSb-152.ru/regulirovanie-obrabotki-personalnyh-dannyh-v-ebs
Biometrics fines 2025-2026vitvet.com/about/news/biometricheskie-dannye-biznes-shtraf-ebs-2026/
OVISION case on construction sitesovision.ru/tpost/mcz7e0a4y1-biometricheskii-skud-na-stroiploschadkah
Access to Construction Sites, 10D Pass + RS EBS (July 2025)cnews.ru/news/line/2025-07-29_prohod_na_strojploshchadki
Losses in CIS's construction industry in H1 2025gd.ru/news/21979-ubytki-stroitelnoy-otrasli-rossii-za-pervoe-polugodie-2025-goda-prevysili-300-mlrd-rubley