Architectural Construction Supervision - digital quality and schedule control

Digital architectural construction supervision helps record deviations, keep photo reports, and control work quality on site.

Our clients

Clients and partners

Capital Group
FSK Group
SMLT
Tochno
Dogma
Sber City
FM Logistic
Danone
Relief Center
Pandora
Architectural Construction Supervision
Saint-Gobain
Askona
FIX PRICE
Snezhnaia Koroleva
Muztorg
TVOE
Greenway
Polaris
Campari
Yandex
Lenta
International perfume and cosmetics brand
Architectural Construction Supervision
RAEC
EKF
L'Etoile
Inventive Retail Group

The system automates architectural supervision: it records deviations, maintains photo reports, and checks compliance with design solutions. The solution helps developers and design organizations ensure quality, transparency, and regulatory compliance on site. Key advantages for the developer, designer, and investor

Why digital architectural supervision is more effective than traditional supervision

  1. Online work progress control. The platform enables remote inspections.

  2. An architect or engineer can track construction progress and record deviations in real time. Automatic issue logging

  3. All defects and violations are logged in the system with photos, mapped to plan zones, and assigned resolution deadlines.

  4. Integration with BIM and the project schedule

  5. Issues are linked to BIM model elements and schedule phases.

  6. This makes it possible to manage quality at the level of individual structures and contractors.

  7. Transparent communication between participants The developer, designer, and contractor work in a single environment: the status of each issue is visible to all parties, which eliminates disputes and duplicate tasks.

Efficiency and growth in one solution

  1. Architectural supervision is the guarantee that a project is built in accordance with the design documentation. However, manual oversight is often inefficient and inconsistent. A digital solution helps architects and engineers monitor construction remotely, record nonconformities, and manage issues in real time. The solution includes:

  2. We implement a digital platform for architectural supervision with deviation tracking.

  3. We automate report generation, photo documentation, and tracking of resolved issues.

  4. We integrate the system with the BIM model and the construction schedule. Business results:

  5. Reduce inspection and report preparation time by up to 40%.

  6. Improved construction quality and more transparent communication.

  7. Minimizing the risk of schedule slips and hidden defects. Simple solutions from idea and analysis to delivery

Map out your integration landscape

We will study your processes and propose a ready-to-use implementation plan

We consult We discuss goals and tasks, define priorities, and set expected outcomes for the joint work

We analyze your processes We study current processes and approaches, identify growth points, and determine which solution will deliver tangible results

We plan the solution rollout, define scope, stages, and timelines, assign responsibilities, and agree on the criteria for success.

Launch and support We implement the solution, train your team and provide support so the solution delivers tangible value

How digitalization improves construction quality and reduces risk

A digital approach to architectural construction supervision makes the process manageable and auditable. The system reduces defects, speeds up responses to issues, and increases transparency for investors. 50% faster report and documentation preparation 50% fewer recurring defects 100% transparency in issue resolution 3x faster communication between designer and contractor Client testimonials

FAQ

Frequently asked questions

How does the system support remote architectural supervision?

Inspections are carried out through a mobile app: the specialist records issues, photos, and comments, and the data is automatically synced with the central system.

Can architectural supervision be integrated with a BIM model?

Yes. Notes and photo records are linked to BIM model elements, making oversight and later analysis easier.

Who has access to issue information?

The developer, designer, and contractor work in a single environment with access rights separation and a transparent change history.

How does the system help monitor defect resolution?

For each issue, deadlines and responsible parties are assigned, and statuses are updated automatically after the fix is checked.

How long does it take to implement the solution?

A pilot is implemented in 1-2 months, and full integration with BIM and ERP takes up to 4 months, depending on company size and the number of sites.

Discuss: Architectural Construction Supervision - digital...

Enter your email or phone number so we can get back to you.

Send via: