Electronic Construction Work Log - online construction control

Implement a digital construction log with site records, photos, quantity checks, and links to KS documents.

Our clients

Clients and partners

Capital Group
FSK Group
SMLT
Tochno
Dogma
Sber City
FM Logistic
Danone
Relief Center
Pandora
Digital Construction Log: Setup and Accounting Integration
Saint-Gobain
Askona
FIX PRICE
Snezhnaia Koroleva
Muztorg
TVOE
Greenway
Polaris
Campari
Yandex
Lenta
International perfume and cosmetics brand
Digital Construction Log: Setup and Accounting Integration
RAEC
EKF
L'Etoile
Inventive Retail Group

We connect supervisors’ entries, photos, schedules, and work quantity confirmations. The general contractor and customer can see who entered and reviewed each record and what needs correction.

What we measure before and after implementation

min/recordentry and review, including returned records
sharerecords returned for correction
timepreparation of the package for review

From a site record to verified quantity

Marketplace

The foreman records actual progressfacility, work, quantity, date, and photo

Verification

Construction control verifiesconfirmation or return with a reason

Mapping

The technical office connects the dataschedule, contract estimate, and accepted quantities

Documents

Package preparationlog, KS document integration, and change history
Photos and the supervisor’s entry confirm the work context. Quantity acceptance and document signing undergo separate agreed checks.

Working journal and official general journal

ChallengeWhat the system providesWhat we agree before launch
Operational recordsWork, quantities, photos, responsible parties, and deadlinesInput forms, required fields, and access permissions
General work logMaintaining records in the applicable regulatory formatProcedure under Order No. 1026/pr, signatures, corrections, and storage
Handover to the customer and supervisionExport of the approved packageFormat, transfer channel, and recipient requirements
Integration with KS documents and 1CMatching accepted quantities with accounting recordsRules for reconciliation, approval, and duplicate elimination

Who works with the record

Foreman and contractor

They record actual progress from a phone or tablet and attach photos. Offline operation and synchronization rules are verified as separate requirements.

Technical office and construction control

They match the record with the schedule and contract, verify the quantity, and accept it or return it with comments.

Project manager and customer

They see overdue checks, discrepancies, and package status. Permissions are limited by facility, organization, and role.

Analyze data and reference master records in your environment

How we implement a work log

  1. 01

    We analyze one project

    We document the participants, work types, documents, and current cost of manual review.

  2. 02

    We select a ready-made foundation

    We assess the capabilities of the existing system or supported platform and outline the required integrations.

  3. 03

    We review the complete workflow

    From record and photo to correction, confirmation, export, and KS document integration.

  4. 04

    Hand over to operations

    We train the team, hand over configurations and application customizations, and assign owners for updates and access management.

Cases

A developer's process automation experience

Read all

FAQ

Frequently asked questions about the digital construction journal

Does the digital journal replace the paper one?

Operational records can be maintained digitally. For a legally significant general log, we separately verify the applicable format and procedure under Order No. 1026/pr, along with signatures, storage, corrections, and the receiving party's requirements. A mobile interface alone does not ensure compliance with these conditions.

Can you work from a phone and offline?

We include mobile entry in the approved workflow. Offline mode, photo storage, and synchronization conflict resolution are tested on the devices and connectivity available at the specific site.

How are the log, schedule, and KS documents connected?

Records are linked to the facility and type of work. The technical department and construction control compare actual progress with the schedule and contract estimate; confirmed quantities are used to prepare KS documents through the established workflow.

How do you assess the value of implementation?

We compare entry and review times, the number of returns, and document package preparation time before and after launch for comparable work. Target values are set after the baseline measurement.

Related construction processes

From verified actual progress, the work moves to acceptance and KS documents. Comments on design solutions are recorded in design supervision log. We connect it to accounting through 1C integration.

Analyze the journal for one project

Show us the current log format, a record with a comment, and the handover requirements. We will define participants, checks, integrations, and criteria for the initial launch.

Discuss the work log

Sources

Verification date: 15.09.2026

Discuss: Electronic construction work log - control...

Enter your email or phone number so we can get back to you.

Send via: