All cases
92 KT.Team cases in retail, logistics, manufacturing, real estate, and pharma/FMCG — each with measurable results and update date.
92 cases in the collection
2026-06-18
Learn more
2026-06-04
Learn more
2026-05-21
Learn more
2026-05-07
Learn more
2026-04-15
Learn more
Schedules became a single digital environment Migrated without losing context Naumen connected design with services
2026-03-26
Learn more
2026-02-19
Learn more
Processing sped up from 30 minutes to 2 per batch of 10 images Recognition accuracy for composition is 80-95%
2026-01-29
Learn more
Order processing time cut by 85% MVP launched in 4 months System MVP launched in 4 months
2025-11-24
Learn more
Building an online store from scratch in 4 months
2025-11-14
Learn more
Conversion grew by 39.9% Profit increased by 57.8% Number of purchases grew by 67.6%
2025-09-28
Learn more
The customer places the order independently
2025-07-22
Learn more
Prepayment became 4.9 times faster Postpaid purchasing became 3 times faster Automated material procurement for sites
2025-07-11
Learn more
Built an international hackathon platform on Python and Django
2025-06-05
Learn more
2025-04-22
Learn more
1C EDMS and CRM linked statuses across teams Linked mortgages and contracts into an end-to-end process Automated document preparation for the deal
2025-04-11
Learn more
Launched an MVP with SAP integration in 1 month B2B portal development for manufacturers
2025-04-08
Learn more
2025-03-08
Learn more
A catalog of 600K SKUs assembled in a single PIM database Integrated Akeneo PIM for Norgau
2025-03-05
Learn more
Labeling service launched in 5 months
2025-03-05
Learn more
Finding analogs across 2M components takes 5 seconds
2025-02-28
Learn more
2025-02-11
Learn more
Gate access, access control, and SMS were linked into one system The optimization plan reduced operational risks Access services became manageable during support
2025-01-22
Learn more
Consolidated property data in one PIM Prices and statuses are updated across all systems Actual floor areas are automatically entered into billing
2025-01-17
Learn more
2024-12-28
Learn more
A single request requires 300-500 MB Implemented a scalable service bus for ATIMO
2024-12-14
Learn more
Akeneo sync with the B2B portal configured Integrated Akeneo PIM Measurable business result delivered
2024-11-28
Learn more
Only well-completed records enter the systems
2024-10-24
Learn more
Delivered a Pimcore-based system for FM Logistic
2024-10-24
Learn more
Replaced point-to-point integrations with Apache Kafka
2024-10-24
Learn more
Built a multi-brand store front end from scratch
2024-10-22
Learn more
2024-09-11
Learn more
2024-07-28
Learn more
Launched a B2B logistics management portal
2024-06-28
Learn more
Integrations became fault-tolerant and transparent Built a unified API to connect 200+ 1C:Retail locations
2024-06-22
Learn more
Specifications are stored centrally and are easy to update The production plan is built automatically
2024-06-19
Learn more
Management data became more accessible to the team
2024-05-02
Learn more
2024-04-28
Learn more
2024-04-26
Learn more
Schedule shifts became visible in real time Construction forecasting became the basis of the IT stack Deadline tracking reduces the risk of delays on site
2024-04-22
Learn more
2024-04-08
Learn more
2024-03-28
Learn more
Conversion grew by 39.9% Profit increased by 67.6% Number of purchases grew by 57.8%
2024-03-24
Learn more
Product information updates in one click Went from start to production launch in 2 months
2024-03-19
Learn more
Average order value grew from ₽1,294 to ₽3,111 Monthly revenue grew from ₽89,312 to ₽1,051,624 Site conversion rose from 0.14% to 1.25%
2024-03-17
Learn more
2024-03-02
Learn more
Turnkey development of the world's first Magento 2 + PWA site
2024-02-24
Learn more
Order placement time cut from 15 to 5 minutes Customers work and place orders 24/7 on their own Delivery time reduced after launch
2024-02-08
Learn more
2024-01-24
Learn more
Revenue grew by 137% One-page checkout improved sales funnel completion A new Magento theme with one-page checkout increased revenue
2024-01-22
Learn more
2024-01-19
Learn more
Media file search dropped from 16 hours to a few minutes Integrated Pimcore DAM for a major furniture manufacturer
2023-12-14
Learn more
Product data became more complete Implemented a PIM system for Muztorg
2023-12-02
Learn more
Connected sellers and established sales
2023-11-05
Learn more
Delivery time reduced after launch
2023-10-24
Learn more
2023-10-24
Learn more
2023-10-14
Learn more
2023-10-11
Learn more
Smoke checks started catching failures earlier Payment statuses were connected without manual reconciliation
2023-09-11
Learn more
Creating a counterparty record sped up from ~1 hour to ~1 minute 10% measurable improvement Delivery time reduced after launch
2023-07-22
Learn more
Managers had less routine and duplicate work Implemented PIM for Polaris: new products launch on marketplaces
2023-07-22
Learn more
Measurable business result delivered
2023-07-08
Learn more
2023-06-11
Learn more
Accreditation was moved into a digital service The admin panel simplified marketplace process development Datareon connected the platform with internal systems
2023-06-08
Learn more
ERP integrated in 8 months The store page loads in 0.1 seconds MVP launched in 4 months
2023-05-17
Learn more
A product export for a partner is generated in 10 seconds 100,000 new products added to the system in an hour and a half Implemented PIM for a plumbing manufacturer
2023-05-02
Learn more
The customer reserves and changes the order in store OMS and 1C in a single order process Connected online and offline sales
2023-04-28
Learn more
2023-03-05
Learn more
SSO and a contractor service portal launched in 2 months Support workload decreased Contractor onboarding sped up
2023-02-17
Learn more
2023-02-14
Learn more
Production data collection has been digitized and automated
2023-02-08
Learn more
Learn more
Learn more
Learn more
Measurable business result delivered
Learn more
Learn more
Learn more
Learn more
Learn more
Learn more
Learn more
Learn more
Learn more
Learn more
Learn more
Learn more
Learn more
Learn more
Learn more
Learn more
Learn more
Learn more